  • Project's Title Riyadh PP11 IPP Project
  • Contract Number PP11-C-004
  • Client Dhurma Electric Company
  • Consultant SEC/Dhurma electricity Co.
  • Value of the Project 68,000,000.00 SR
  • Time Frame 8TH September 2010 till 30TH June 2011
  • Location of Project Dhuruma, Riyadh, K.S.A.
  • Highlights 25 Kilometer Access Road Asphalting for Power Plant 293,000 M3 Rock Breaking Civil works including culverts, swales etc

Power Plant - Ii

Infrastructure works such as 25 Kilometer Access Road Works with Asphalting, culverts, street lighting etc for Power Plant at Dhurma Near Riyadh-K.S.A. An Independent Power plant (IPP) project, 150 Km from Riyadh City, Major works includes Civil and Infrastructural works, Earth works, Asphalt work, construction of pipe culverts and Box culverts, Protection of Road Slope, Construction of 25 Km Access Road with Asphalting.

Key Features of the Project

Construction of 25 Km access road with asphalting 293,000 m3 of Rock breaking and removing, approximately 295,000 m3 of rock to achieve the formation level of the
access road.
Civil, Infrastructural, Earth Works for the complete road area
Site preparation and Earth Works for the road area
Excavation and Stock piling
Disposal of excess and waste material
Fill and back fill base course for the 25 Km road
Drainage and Sewer works for the road, it is included box and pipe culverts, Swale works etc
Removal of surplus spoil from whole area of the road
Laying of drains, pipes and its fittings for drainage system
Reinforced concrete works for slope protection road drainage system, etc.