Maaden Phosphate Plant
Maaden Phosphate Plant
Construction of Two Concrete Silos with 18.2 & 29.6 Meter Height with related civil and structural works Ma'aden Phosphate Plant has awarded this contract to "Mohammad Al-Mojil Group" which in turn has requested ETE to perform the complete work on back to back to basics.
Key Features of the Project
- Construction of Two Concrete Silos by slip forming method within 5months.
- Silo T02 height 18.2 M and 26 M dia.
- Silo T03 height 29.6 M and 26M dia.
- Construction of foundations of conveyor.
- Construction of pile caps, foundations, columns.
- Construction of suspended beams, slab and Silo Structure.
- Construction of Storage Building.