  • Project's Title KARAN GAS FACILITIES
  • Contract Number 6600021905(IK)
  • Client ARAMCO & HYUNDAI ENGINEERING
  • Consultant SAUDI ARAMCO
  • Value of the Project 142,000,000.00 SR
  • Time Frame 26th November 2009 till date 20th January 2012
  • Location of Project Kursaniyah, K.S.A.
  • Highlights Civil works for all the Foundations Sub Stations RTR works PIB Buildings Inlet Facilities Area Miscellaneous Facilities

Karan Gas Facilities

Construction of 4 Substations & 3 PIBs (Blast Resistant), ОМЕ and other 19 no of associated Buildings, HDEC as the main contractor will build gas processing trains consisting of gas handling, gas sweetening, acid gas enrichment, gas dehydration and supplementary propane refrigeration. There package will also include the inlet and utilities facilities to support each processing gas train. ETE takes pride to be a part of this project as a Subcontractor to HDEC to Construct the TRAIN Substations, PIB's (Process Interface building), Communication & Sunshade Buildings, Analyser & Car parking shelter, OME Building, Musalla Building and Smoking

Key Features of the Project

Complete Civil & Building works including but not limited to 4 Blast Resistant Substations using precast wall panels and double tee slabs, 3 Blast Resistant Process Interface Buildings, OME Building, EDG Building using "Cast In Situ Monolithic Construction" Civil works for pipe rack foundations, pipe supports, and all related equipment foundations.
RTR works for firefighting lines
Communication & Sunshade Building
Complete finishing works for the buildings,
Procurement, Installation, Testing & Commissioning of Electrical
Power & Lighting works inside building
BLAST RESISTANT BUILDINGS: PIB 254, PIB255, PIB 256, PІВ 253.
Process Train 1: Substation 244, PIB 254, Communication & 
Sunshade Bldg. 1, Analyzer & Car Parking Shelter 1
Process Train 2: Substation 245, PIB 255, Communication &
Sunshade Bldg. 2, Emergency Diesel Generator Bldg., Analyzer &
Car Parking Shelter 2
Process Train 3 Substation 246, PIB 256, Communication &
Sunshade Bldg. 3, Analyzer & Car Parking Shelter 3
Miscellaneous Facilities
Operation Maintenance Building
Musalla Building, Smoking Shelter
Car Parking Shelter 5
Sewer & Drainage system